Home -
  • Ko Wai Mātou. About
    • Future Development Strategy
    • Wellington Regional Growth Framework
  • A Mātou Mahi. Our Projects
    • Aggregate Opportunity Sites Study
    • Future Development Strategy
    • Regional Housing & Business Development Capacity Assessment
    • Iwi Capacity and Capability Project
    • Levin-Taitoko Structure Plan
    • Priority Development Areas
    • Regional Adaptation Project
    • Regional Economic Development Plan 2022-2032
    • Regional Emissions Reduction Plan 2024-2030
    • Regional Food System Plan
    • Regional Housing Action Plan
    • Regional Industrial Land Study
    • Urban Design Toolkit
    • Wellington Transport Emissions Reduction Pathway
  • Pūrongorongo. Reports and papers
  • Regional Data Dashboard
  • Whakapā Mai. Contact Us
Home -
    • Ko Wai Mātou/ About
    • Future Development Strategy
    • Wellington Regional Growth Framework
    • A Mātou Mahi/ Our Projects
    • Aggregate Opportunity Sites Study
    • Future Development Strategy
    • Regional Housing & Business Development Capacity Assessment
    • Iwi Capacity and Capability Project
    • Levin-Taitoko Structure Plan
    • Priority Development Areas
    • Regional Adaptation Project
    • Regional Economic Development Plan 2022-2032
    • Regional Emissions Reduction Plan 2024-2030
    • Regional Food System Plan
    • Regional Housing Action Plan
    • Regional Industrial Land Study
    • Urban Design Toolkit
    • Wellington Transport Emissions Reduction Pathway
  • Pūrongorongo Reports and papers
  • Regional Data Dashboard
  • Whakapā Mai Contact Us
  • Derivation of numeric objectives and limits for Te Awarua-o-Porirua WIP - March 2019 - Prepared by GWRC preview

    Derivation of numeric objectives and limits for Te Awarua-o-Porirua WIP - March 2019 - Prepared by GWRC

    Derivation of numeric objectives and limits for Te Awarua-o-Porirua WIP - March 2019 - Prepared by GWRC preview

    Download now (PDF 846 KB)

    alarm Published 01 Mar 2019
  • Review of objectives and limits for the Te-Awarua-o-Porirua Whaitua Implementation Programme - March 2019 preview

    Review of objectives and limits for the Te-Awarua-o-Porirua Whaitua Implementation Programme - March 2019

    Review of objectives and limits for the Te-Awarua-o-Porirua Whaitua Implementation Programme - March 2019 preview

    Download now (PDF 364 KB)

    alarm Published 01 Mar 2019
  • Wellington Metropolitan Rail 2017/2018 Annual Report June 2018

    Download now (PDF 3.9 MB)

    alarm Published 01 Mar 2019
  • Notified Officers Report preview

    Notified Officers Report

    This report contains an analysis of the resource management issues in respect of WAR170229, an application by South Wairarapa District Council (SWDC), to obtain discharge permits from Greater Wellington Regional…

    Notified Officers Report preview

    Download now (PDF 1.6 MB)

    alarm Published 01 Mar 2019
  • Appendix E: Coastal Processes preview

    Appendix E: Coastal Processes

    This document contains a technical report focusing on the effects of the project with respect to physical processes in the coastal and estuarine environment; including both the temporary effects arising…

    Appendix E: Coastal Processes preview

    Download now (PDF 25 MB)

    alarm Published 01 Mar 2019
  • TE KĀURU UPPER RUAMĀHANGA PROPOSED FLOODPLAIN MANAGEMENT PLAN - SUMMARY FOR PUBLIC CONSULTATION preview

    TE KĀURU UPPER RUAMĀHANGA PROPOSED FLOODPLAIN MANAGEMENT PLAN - SUMMARY FOR PUBLIC CONSULTATION

    A floodplain management plan is a document that describes the approach to flood and river management over the next 30-40 years. It describes various types of responses that will be…

    TE KĀURU UPPER RUAMĀHANGA PROPOSED FLOODPLAIN MANAGEMENT PLAN - SUMMARY FOR PUBLIC CONSULTATION preview

    Download now (PDF 18 MB)

    alarm Published 01 Mar 2019
  • 7512_Minutes_Confirmed minutes 2018.608.pdf

    Download now (PDF 82 KB)

    alarm Published 28 Feb 2019
  • Appendix 8: Technical Review  preview

    Appendix 8: Technical Review

    This document contains the technical review of the Featherston Wastewater Treatment Plant consent application (WAR170229), which considers the proposed land discharge of treated wastewater to land and the associated assessment…

    Appendix 8: Technical Review  preview

    Download now (PDF 312 KB)

    alarm Published 27 Feb 2019
  • Appendix F: Consent Level Beach Nourishment Design and Effects Assessment preview

    Appendix F: Consent Level Beach Nourishment Design and Effects Assessment

    This document contains the consent level design for the proposed beach nourishment that forms part of the shared path project. This is proposed as a strategy to mitigate the loss…

    Appendix F: Consent Level Beach Nourishment Design and Effects Assessment preview

    Download now (PDF 20 MB)

    alarm Published 25 Feb 2019
  • 7507_Minutes_Confirmed minutes 2018.586&588.pdf

    Download now (PDF 33 KB)

    alarm Published 22 Feb 2019
  • Prev
  • 1
  • ...
  • 548
  • 549
  • 550
  • 551
  • 552
  • ...
  • 2386
  • Next
Archive - Library
  • February 2026
  • January 2026
  • 2025 - 2016
  • 2015 - 2006
  • 2005 - 1996
  • 1995 - 1970

Kāinga 

  • Ko Wai Mātou
  • A Mātou Mahi
  • Pūrongorongo
  • Whakapā Mai

Home 

  • About
  • Our Projects
  • Reports
  • Regional Data Dashboard
  • Contact Us

Misc 

  • Get in touch
  • Privacy policy
  • Terms & conditions
Greater Wellington Regional Council Logo, Te Pane Matua Taiao
Copyright © 2026 Greater Wellington Regional Council
New Zealand Government Logo