Home -
  • Ko Wai Mātou. About
    • Future Development Strategy
    • Wellington Regional Growth Framework
  • A Mātou Mahi. Our Projects
    • Aggregate Opportunity Sites Study
    • Future Development Strategy
    • Regional Housing & Business Development Capacity Assessment
    • Iwi Capacity and Capability Project
    • Levin-Taitoko Structure Plan
    • Priority Development Areas
    • Regional Adaptation Project
    • Regional Economic Development Plan 2022-2032
    • Regional Emissions Reduction Plan 2024-2030
    • Regional Food System Plan
    • Regional Housing Action Plan
    • Regional Industrial Land Study
    • Urban Design Toolkit
    • Wellington Transport Emissions Reduction Pathway
  • Pūrongorongo. Reports and papers
  • Regional Data Dashboard
  • Whakapā Mai. Contact Us
Home -
    • Ko Wai Mātou/ About
    • Future Development Strategy
    • Wellington Regional Growth Framework
    • A Mātou Mahi/ Our Projects
    • Aggregate Opportunity Sites Study
    • Future Development Strategy
    • Regional Housing & Business Development Capacity Assessment
    • Iwi Capacity and Capability Project
    • Levin-Taitoko Structure Plan
    • Priority Development Areas
    • Regional Adaptation Project
    • Regional Economic Development Plan 2022-2032
    • Regional Emissions Reduction Plan 2024-2030
    • Regional Food System Plan
    • Regional Housing Action Plan
    • Regional Industrial Land Study
    • Urban Design Toolkit
    • Wellington Transport Emissions Reduction Pathway
  • Pūrongorongo Reports and papers
  • Regional Data Dashboard
  • Whakapā Mai Contact Us
  • TN16 WPTM and WTSM PT Assignment Comparison preview

    TN16 WPTM and WTSM PT Assignment Comparison

    The purpose of this note is to demonstrate that both the Wellington Transport Strategy Model (WTSM) and the Wellington Public Transport Model (WPTM) display similarities in their representation of travel…

    TN16 WPTM and WTSM PT Assignment Comparison preview

    Download now (PDF 1.5 MB)

    alarm Published 31 Dec 2013
  • TN15 Input Parameters preview

    TN15 Input Parameters

    Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…

    TN15 Input Parameters preview

    Download now (PDF 2.7 MB)

    alarm Published 31 Dec 2013
  • Wellington Regional Strategy - 2012 preview

    Wellington Regional Strategy - 2012

    This Wellington Regional Strategy (WRS) reflects a renewed commitment by all the councils in the Wellington region to support, promote and facilitate sustainable economic growth for the region.

    Building on the…

    Wellington Regional Strategy - 2012 preview

    Download now (PDF 992 KB)

    alarm Published 31 Dec 2013
  • TN6 WPTM Specification preview

    TN6 WPTM Specification

    Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…

    TN6 WPTM Specification preview

    Download now (PDF 1.1 MB)

    alarm Published 31 Dec 2013
  • TN5b Rail Intercept Survey Analysis

    This technical note describes the cleaning and analysis of the rail intercept surveys that were carried out by TDG and Research NZ as part of the Wellington Public Transport Model…

    There is no digital version of this document available, but you can get in touch with publications@gw.govt.nz to get a copy of the document.

    alarm Published 31 Dec 2013
  • Proposed Regional Policy Statement for the Wellington region Consent orders version preview

    Proposed Regional Policy Statement for the Wellington region Consent orders version

    “Consent orders version” of proposed Regional Policy Statement (2012)

    Proposed Regional Policy Statement for the Wellington region Consent orders version preview

    Download now (PDF 2.6 MB)

    alarm Published 31 Dec 2013
  • TN5a Bus Intercept Survey Analysis preview

    TN5a Bus Intercept Survey Analysis

    This technical note describes analysis of the bus intercept surveys. These intercept surveys were carried out to inform the development of the strategic Wellington Public Transport Model (WPTM) as part…

    TN5a Bus Intercept Survey Analysis preview

    Download now (PDF 2.1 MB)

    alarm Published 31 Dec 2013
  • TN29 Demographic Inputs to WTSM with Appendices preview

    TN29 Demographic Inputs to WTSM with Appendices

    A key input to the development of the WTSM model is land use data which is used in the development of trip matrices. Travel demand within the Wellington Strategic Transport…

    TN29 Demographic Inputs to WTSM with Appendices preview

    Download now (PDF 5.5 MB)

    alarm Published 31 Dec 2013
  • TN2 Survey Sampling Methodology preview

    TN2 Survey Sampling Methodology

    Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…

    TN2 Survey Sampling Methodology preview

    Download now (PDF 1.3 MB)

    alarm Published 31 Dec 2013
  • Correspondence from December 2012 preview

    Correspondence from December 2012

    This document outlines correspondence between applicant and GWRC regarding resource consent WGN130085 [31970]. 

    Correspondence from December 2012 preview

    Download now (PDF 21 MB)

    alarm Published 26 Dec 2012
  • Prev
  • 1
  • ...
  • 941
  • 942
  • 943
  • 944
  • 945
  • ...
  • 2421
  • Next
Archive - Library
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • 2025 - 2016
  • 2015 - 2006
  • 2005 - 1996
  • 1995 - 1970

Kāinga 

  • Ko Wai Mātou
  • A Mātou Mahi
  • Pūrongorongo
  • Whakapā Mai

Home 

  • About
  • Our Projects
  • Reports
  • Regional Data Dashboard
  • Contact Us

Misc 

  • Get in touch
  • Privacy policy
  • Terms & conditions
Copyright © 2026 Greater Wellington Regional Council
New Zealand Government Logo